This is going to be Draco's new home when I am done.
futureviv.jpg
 

jpjohnsr

Member
Original Poster
oh it will be a wait. I just bought the entertainment center. I was planning on taking a month and doing a little at a time.
 

jpjohnsr

Member
Original Poster
Well I have had three days off work because of the weather here in beautiful Illinois, so I worked faster in the viv. Three coats of water based primer, a little wiring and some holes cut and we are ready for light bulbs and the fun stuff that we will be filling it with so Draco will feel at home. I am probably going to wait a couple weeks before putting the doors on to let it air out as much as possible. I did learn one valuable lesson about using a hole saw on laminated wood. Can you find my screw up?

The floor
floor.jpg


The side vents.
sidevents.jpg


All venting.
allvents.jpg


Wiring
wireing.jpg


Lighting fixtures
lighting.jpg
 

Slave2Scarlett

Gray-bearded Member
Wow thats looking pretty good! I would suggest one thing though.. One problem that i ran into after ours was finished was I couldn't get Scarlett close enough to the UVB bulb and we ended up having to lower it.. So just make sure you will have some way of getting your beardie close to the uvb at least 8-10 inches away.. Looks great though!
 

Slave2Scarlett

Gray-bearded Member
jpjohnsr":2sc67xu7 said:
Some one in another thread was nice enough to post a very good lighting study. I will be putting a reflector on the uvb bulb and building a basking spot up high enough to get proper temps and UV. Thanks for the thoughts.

Give this a look. http://www.uvguide.co.uk/fluorescenttubereflectortests.htm

Sounds perfect.. We lowered our light but we are also in the process of building some sort of rock structure to go across the back of the viv with a platform of some sort.. Still haven't figured out all the details yet..
 

jpjohnsr

Member
Original Poster
At long last the task is complete. I am sorry we did not post more as we went but we were kind of self conscious about what we were doing. We are however kind of proud of the final results. So with out further adieu...

the first Castle we built was just to much and not sturdy enough.
IMAG0010.jpg


The second castle is a better fit. this is the basic box and bare walls.
barewalls.jpg


Now the painting starts.
painting.jpg


One more dry fit.
dryfit.jpg


The complete Viv.
vivcomplete.jpg


Now with the lights and doors.
litesdoors.jpg


The castle was then stormed!!!!!!
stormed.jpg
 
Status
Not open for further replies.

Members online

No members online now.

Latest resources

Latest posts

Latest profile posts

Go88 là một trong những nhà cái cá cược trực tuyến hàng đầu với danh tiếng vững chắc trong cộng đồng người chơi.
Website: https://https://appgo88.link/
Tag: #appgo88link #go88link #Game_Go88 #Game_bài_Go88 #Cổng_game_Go88 #Tài_xỉu_Go88 #Nạp_tiền_Go88 #Rút_tiền_Go88 #play_Go88
Website:
https://smartcity.bandung.go.id/member/bsc3090527795d
Mirage came out of brumation on April 26. He was doing great. On May 2 he started acting funny. We just redid his tank, and he keeps going into one of his hides. He just lays there. He shows no intrest in food. HELP!
is tape safe for fixing something in my leopard geckos hide?
Day 3 of brumation. It's a struggle. I really miss my little guy. 😔
Mirage entered brumation yesterday, I'm gonna miss hanging out with my little guy.

Forum statistics

Threads
156,220
Messages
1,259,119
Members
76,140
Latest member
Jesper
Top Bottom