Still a long long way to go but I have started roughing out Hesperians new home. This is just getting proportions in. There's a lot of work left, but at least I have some idea of how things will fit.
A little more placement and I have a good idea of where I want to place things. Now to crack on with making everything sealed, safe and livable for Hesperian.
Sourcing everything to be Beardie safe has been a fun challenge. The lid will be cut to accommodate a hood and the heat and basking lights. That will probably be next. Then the outside structure. Staining, sealing, tiling and all the details still to do.