I took a couple more pics of my progress, I got the tank and the stand all stained and sealed I got the doors hung and the stand painted on the inside as well as got the slate glued and grouted. All thats left is to build the door for the cage build the rock wall and hang the lights. So....
ON TO THE PICS!!!!
Stand stained doors hung and magnets mounted
Slate glued and grouted
I had my girlfriend paint the ceiling of the cage. Its hard to tell but its blue and grays and whites, Ill try and get a better pic with my camera.
These are the vents I am going to use on the outside. I am going to staple some screen on the inside then cover that with the rock wall with a hole as big as the vent.
More to come after christmas. I already got the foam and the great stuff. I also got some felt to cover the outside bottom of the cage so it doesnt scratch the stand. Soon I should be done.